PM Surya Ghar Yojana is the central government’s rooftop solar scheme for homes. It pays a fixed subsidy, up to ₹78,000, towards the cost of putting solar panels on your roof, so that the household can generate its own electricity and cut the monthly bill sharply. The scheme was announced in February 2024 with an outlay of ₹75,021 crore and a target of one crore homes. In August 2026 the Ministry of New and Renewable Energy said installations had crossed 50 lakh households, with July 2026 alone adding more than five lakh.
This article focuses on the money: how much subsidy you get, what system size suits your home and how long it takes to recover your cost. A separate guide on this site covers the application process screen by screen.
PM Surya Ghar at a glance
| Point | Detail |
|---|---|
| Full name | PM Surya Ghar: Muft Bijli Yojana |
| Ministry | New and Renewable Energy (MNRE) |
| Announced | 13 February 2024; approved by Cabinet on 29 February 2024 |
| Outlay | ₹75,021 crore |
| Target | One crore households by 2026-27 |
| Maximum subsidy | ₹78,000 per household |
| Portal | pmsuryaghar.gov.in |
| Helpline | 15555 |
The subsidy slabs
The central subsidy depends only on the size of the system, measured in kilowatts (kW).
| System size | Subsidy |
|---|---|
| 1 kW | ₹30,000 |
| 2 kW | ₹60,000 |
| 3 kW or more | ₹78,000 |
The rule behind the table is simple: ₹30,000 per kW for the first 2 kW, ₹18,000 for the third kW, and nothing beyond 3 kW. You can install a bigger system, but the subsidy stays capped at ₹78,000. For 2.5 kW, for example, the subsidy is ₹69,000.
Some states add their own subsidy on top. Check with your electricity distribution company, which everyone calls the discom.
What size do you need?
The ministry’s suggestion is based on how many units you use in a month.
| Monthly use | Suggested system | Subsidy |
|---|---|---|
| Up to 150 units | 1 to 2 kW | ₹30,000 to ₹60,000 |
| 150 to 300 units | 2 to 3 kW | ₹60,000 to ₹78,000 |
| Above 300 units | Above 3 kW | ₹78,000 |
A 1 kW system produces roughly 4 units a day in good sun, or about 120 units a month. The exact figure depends on your city, the direction and tilt of the panels, shade and dust. A 3 kW system at that rate gives about 360 units a month, which is where the “300 units of free electricity” description of the scheme comes from.
Roof space matters too. Each kW needs around 8 to 10 square metres of shade-free area.
What it really costs
Prices differ by state, brand, mounting structure and vendor. As a broad range, a grid-connected home system has been quoted at about ₹50,000 to ₹70,000 per kW before subsidy. The table uses ₹60,000 per kW to show the idea.
| System | Approximate price | Subsidy | Your cost |
|---|---|---|---|
| 1 kW | ₹60,000 | ₹30,000 | ₹30,000 |
| 2 kW | ₹1,20,000 | ₹60,000 | ₹60,000 |
| 3 kW | ₹1,80,000 | ₹78,000 | ₹1,02,000 |
| 5 kW | ₹3,00,000 | ₹78,000 | ₹2,22,000 |
Get written quotes from at least two or three vendors registered on the national portal. You pay the vendor the full agreed amount, or the amount net of loan, and the subsidy later comes to your bank account directly.
Put in your own numbers here.
Loading calculator. If nothing appears, turn on JavaScript in your browser.
How the saving works
With net metering, the discom fits a meter that records both the power you draw from the grid and the surplus you send back. Your bill is for the difference.
Take a home that uses 250 units a month and pays about ₹7 a unit.
- A 3 kW system generates about 360 units.
- The home’s 250 units are fully covered, saving about ₹1,750 a month.
- The surplus of around 110 units is credited or paid for as per the state’s rules.
- Net cost after subsidy at the example price is about ₹1.02 lakh.
- At ₹1,750 a month the cost is recovered in about five years.
Solar panels usually carry a performance warranty of around 25 years, so the years after payback are largely free power, apart from cleaning and an inverter replacement at some point.
Who is eligible
- An Indian citizen
- Who owns a house with a roof suitable for solar panels
- With a valid electricity connection in the household
- Who has not taken any other subsidy for rooftop solar
Tenants need the owner’s cooperation, because the connection and the roof belong to the owner. Flats and housing societies have a separate provision, described below.
Housing societies
Group housing societies and resident welfare associations can get a subsidy of ₹18,000 per kW for common facilities such as lifts, pumps, lighting and electric vehicle charging, up to 500 kW in total at 3 kW per house, including any individual rooftop systems in the building.
Loans for the balance amount
Banks offer collateral-free loans for systems up to 3 kW at concessional rates linked to the repo rate, typically around 6 to 7 per cent a year. Applications are processed through the Jan Samarth portal, which is linked to the scheme’s website. By August 2026 about 17.5 lakh installations had used loan financing. In many cases the EMI is close to, or lower than, the bill saving.
Model solar villages
One village in each district is being developed as a model solar village with central assistance of ₹1 crore, selected through a competition among villages above a population threshold. If your village is in the running, the gram panchayat will have the details.
Beyond your own roof: other models
For households that cannot pay upfront, two utility-led models exist.
- RESCO model: a renewable energy service company installs and owns the system on your roof for a contract period. You pay only for the electricity you use.
- Utility-led aggregation: the discom or a state agency installs systems on behalf of groups of households.
Availability depends on your state.
Things to check before you sign
| Check | Why |
|---|---|
| Vendor is registered on the national portal | Subsidy is released only for installations by registered vendors |
| Panels are made in India with Indian-made cells where required | Domestic content rules apply to subsidised systems |
| Inverter and panel warranties in writing | You will need them years later |
| Net meter charges and timeline | These are paid to the discom separately |
| Annual maintenance terms | Many vendors include five years of service |
| Sanctioned load on your connection | The system size cannot exceed what the discom permits |
Frequently asked questions
Is the electricity really free?
The scheme does not give free grid power. It helps you produce your own. A correctly sized system can bring the bill for the first 300 units or so down to zero or near it.
Does the system work during a power cut?
A standard grid-connected system switches off during a cut for safety. Backup needs a hybrid inverter and batteries, which cost extra and are not covered by the subsidy.
How long does the subsidy take?
After the discom commissions the system and you submit bank details, the subsidy is generally credited within about 30 days.
Can I apply if I already have rooftop solar without subsidy?
The scheme is meant for new installations. An extension to an existing system is treated according to the portal’s rules at the time.
Is there an income limit?
No. Any household that meets the basic conditions can apply.
Subsidy rates have stayed unchanged since launch, but confirm the current figures on pmsuryaghar.gov.in before you place an order.